Products Europe B.V.  
       
    Visit Allied Mineral Europe at Metallurgy-Litmash in booth 7-5 C19 May 27-30 in Moscow, Russia.  

                                   

 

EVS Case History
 

A foundry in the Midwestern USA has two 12.5 MT, high powered medium frequency furnaces for melting ductile iron at 1500°C.  Typical campaigns were four weeks and 4,000 MT using MINRO-SIL® RAM 1001, 0.8% Boron Oxide.  Installations were done using a pneumatic internal form vibration system (high frequency).  The total reline time including lining the spout and the back slagger with plastic, plus the floor and sidewall took 6 people 9 hours to complete.    This foundry converted to MINRO-SIL 2001 and achieved 6,000 MT campaigns using the same installation equipment.
 

Now using the EVS, the total reline takes 4.5 hours with 3 people.  The packaging was changed to 1 MT bulk bags.  The refractory campaigns now last an average of ten weeks or 10,000 MT.
 

End result:  Labor reduced by 50%.
                    Installation time reduced by 50%.
                    Refractory campaigns have doubled.

 

Call today for more information!
 

Allied Mineral Products Europe
Phone: 31-166-605153 Fax: 31-166-602898
info@alliedeurope.com 
 

        Home     Affiliates/Divisions     Advantages     Markets Served     Products     Featured Products      Links     Employment        Contact Us
 
Send questions or comments about this web site to the Webmaster
Copyright © 2006 Allied Mineral Products, Inc.
Legal Notice
Last modified: March 17, 2008